Your COIs Look Good. What’s Hiding in the Policies?

●
45 min read
Copied to clipboard

Your COIs Look Good. What’s Hiding in the Policies?

A subcontractor’s COI can show every limit and endorsement the contract asks for while the policy behind it excludes the very work being done. In this session, Jessica Lopes talks with Hisrain Reis, who leads the Policy Review team at Jones, about what the COI leaves unanswered, which exclusions deserve attention, and how a gap goes from finding to decision, using a homebuilder example from a real review.

Jessica Lopes

Jessica Lopes

Host · Senior Director of Risk and Compliance, Jones

Hisrain Reis

Hisrain Reis

Policy Review Manager, Jones

We’ve split the session into short sections below, each starting at the right moment in the recording.


What the COI Shows, and What It Doesn’t

Hisrain starts with what the certificate does tell you, and why it only tells it in broad strokes.



1
What this section covers
  • The COI shows that the policy exists, its limits and dates, and specific coverages: additional insured status for ongoing and completed operations, primary and non-contributory wording, and a waiver of subrogation.
  • The policy shows the nature of those coverages, and whether anything in it excludes coverage completely.
  • That’s why builders and GCs should read the policy, or at least the schedule of forms, even when the COI is perfect.
  • In a policy review, the team goes through each form, compares every exclusion with the scope of work, and flags only the gaps that apply, so the sub has a chance to fix the policy.
📋
Key takeaway

A perfect COI tells you what the policy covers. Only the policy tells you what it excludes.


Coverage Can Shrink Without Disappearing

The certificate says on its face that it’s for information only. It shows what exists, never what doesn’t. Beyond outright exclusions, Hisrain points to limiting clauses that cut coverage without removing it.



2
What this section covers
  • Contractual liability limitation: the sub signs an indemnity agreement, but if the policy doesn’t cover it, the insurer won’t pay that claim.
  • Action over exclusion: removes coverage when a sub’s employee gets hurt and sues the builder, the GC or the owner.
  • Classification limitation: a sub classified for framing who does roofing work isn’t covered for it.
  • Defense costs inside the limit: the $1 million on the COI shrinks quickly once a claim’s defense costs come out of it.
📋
Key takeaway

None of these show on a COI. The only way to verify them is to read the policy.


The Exclusion That Matters Is the One Tied to the Work

For a homebuilder, that usually means residential exclusions, and they come in many shapes.



3
What this section covers
  • Broad exclusions remove all residential work, which often happens when a sub works mostly on commercial projects and doesn’t realize it.
  • Narrow exclusions target specific work: condos or townhomes, developments above a unit cap, or remodeling and conversion instead of new construction.
  • Other exclusions follow the trade, like subsidence for grading and foundation work.
  • Matching each exclusion to the scope and the project avoids friction with subs over gaps that don’t apply.
  • As Jessie adds, subs often don’t know their policy carries the exclusion. It isn’t intentional; most aren’t insurance specialists.
📋
Key takeaway

Don’t treat “residential” as the word to fear. Ask which exclusion applies to this project.


The Example: A COI That Passes

Hisrain shares a sample based on a real Jones review, starting with the builder’s requirements.



4
What this section covers
  • The requirements: $1 million per occurrence, $2 million general aggregate, primary and non-contributory wording, waiver of subrogation, additional insured for ongoing and completed operations, contractual liability, a per-project aggregate, and occurrence-based coverage.
  • The builder also requires the full policy, with no residential exclusions of any kind and no designated work exclusions tied to the scope.
  • The project: new residential construction, 300 units.
  • The COI: the right limits, the occurrence and per-project boxes checked, and the builder named as additional insured on a primary basis with a waiver of subrogation.
📋
Key takeaway

If the review stopped at the COI, this sub would be approved. And as Jessie points out, it isn’t a one-off: it happens all the time.


Where the Answer Changes

The review starts at the schedule of forms, which lists every form on the policy, including two residential exclusions.



5
What this section covers
  • The new residential construction exclusion has exceptions marked by checkboxes: custom homes, condominiums, townhouses, site work. Only one is checked: tract work limited to 225 units per development.
  • The project has 300 units, so the exception doesn’t reach it, and the exclusion applies.
  • The definition of new residential construction carries its own exception for apartments, military barracks and hotels, which doesn’t apply here either.
  • The residential conversion exclusion doesn’t apply to new construction, so it isn’t flagged.
📋
Key takeaway

Of two residential exclusions, only one was a gap. Flagging just what applies keeps policy review from turning into waivers left and right.


Additional Insured Can’t Outrun an Exclusion

The policy does carry the additional insured endorsements the COI promised, CG 20 10 for ongoing operations and CG 20 37 for completed operations, with the builder named.



6
What this section covers
  • On paper, the builder is protected during the work and after it, usually for five or ten years.
  • But the exclusion applies to the whole policy, so it removes coverage for the named insured and the additional insured alike.
  • With the work excluded, nobody is protected, no matter how correct the rest of the policy is.
📋
Key takeaway

A compliant-looking COI doesn’t give you the protection it suggests. On high-risk projects, that peace of mind has to come from the policy.


From a Gap to a Decision

Once a gap is flagged, Hisrain walks through what happens next.



7
What this section covers
  • If the sub says the exclusion doesn’t apply to their scope, the builder or GC gets looped in to decide.
  • If it does apply, the sub can get a carve-back that removes the exclusion for that builder, GC or project.
  • Or they can buy a separate policy for the excluded work, and both policies are reviewed together for one compliance status.
  • If the gap can’t be fixed, accepting the risk is a business decision for the builder or GC, documented with the sub’s explanation, who approved it, and a re-review date.
  • In Jones, the waiver is recorded with the supporting document, the approver and the re-review date, so there’s a paper trail if a claim comes.
📋
Key takeaway

An exception isn’t forever. Record who approved it, why, and when it gets reviewed again.


Technology Gets There Faster. Analysts Make the Call.

Jessie asks how technology has changed policy review since Jones turned it into a product.



8
What this section covers
  • Collection is the pain point for anyone who has tried to gather policies, and Jones uses technology to make it easier for subs, including grace periods when a policy isn’t ready.
  • AI reads the list of exclusions in the forms, backed by a database of exclusions the team has built over time, so documents that once had to be read in full move much faster.
  • The decisions stay with the analysts: whether an exclusion applies to the scope of work, and whether it needs a gap.
  • Carriers keep introducing new and trickier wording, and seeing policies from so many carriers helps the team anticipate it.
📋
Key takeaway

Technology speeds up the review. Five years of insurance expertise decides what’s actually a gap.


Where to Start: The Schedule of Forms

For teams that only review COIs today, Hisrain’s first step is simple.



9
What this section covers
  • Collect the schedule of forms. It’s easier to get than the full policy and lists every form by title.
  • Use it to spot residential, designated work, or other exclusions tied to the scope, then request those specific forms for a deeper review.
  • Make sure your contracts require subs to provide policy documents, or they may resist sharing them.
  • Don’t rely on titles alone: extension endorsements can hide an exclusion several subsections deep.
📋
Key takeaway

The schedule of forms is a great first step, not the last one. Build policy review over time, with the know-how to read what’s behind each title.


Take the Review Process With You

Everything Hisrain walked through, from the schedule of forms to exceptions, the scope of work, the exception process and renewals, is in one checklist.

The Policy Review Checklist

8 things to check after the COI looks good, plus the example from the webinar.

Download The ChecklistExplore Policy Review


A Clean COI Is Where the Review Starts

A certificate can check every box while the policy behind it excludes the work being done. Policy review closes that gap by reading what the COI can’t show, matching it to the project, and turning each finding into a decision.

  • Start with the schedule of forms, then read the forms that touch the work.
  • Check the exceptions and definitions, not just the exclusion’s title.
  • Flag only what applies to the scope and the project.
  • Fix gaps with a carve-back or a separate policy, or document the exception with an approver and a re-review date.
  • Recheck at renewal, because carriers keep changing the wording.

Questions from the Audience, Answered Live

The session closed with questions from the audience. Watch them below, or open a question and jump straight to the answer.



Why now
Is reviewing policies, and not just COIs, becoming more important?

Yes. Carriers keep introducing new types of exclusions, and some come built into a policy because of the carrier or the insurance program the sub is on. That information often sits with the broker, so the builder, and even the sub, may not know it’s there. Jessie adds that for GCs and homebuilders, claims are a constant, not a maybe. Knowing a sub’s exclusions up front lets you decide whether to work with them before a claim lands on you.

▶  Watch this answer (34:20)

Renewals
If a policy renews with the same carrier, do you need to review the full policy again?

It’s important to look at renewals too. Conservative builders and GCs re-review the full policy to make sure nothing was added or changed. Others confirm that the schedule of forms and the language stayed the same. At a minimum, get the full policy or the schedule of forms every year. Being more lenient at renewal is a common approach, but it’s an assumed risk: the same policy number and carrier tell you the COI didn’t change, not that the exclusions didn’t.

▶  Watch this answer (36:39)


Read the Full Conversation

Prefer to read? The complete, lightly edited transcript of the session is below.

Show full transcript

Jessie: Hello everybody. Welcome to our webinar today. We’re going to be talking about how policies have so much more interesting things to look at in the COI. What’s hiding behind them. And for this conversation, I have with me Hisrain. Hisrain is the Policy Review Manager of our team here at Jones. He’s been working with Policy Review for the past four years, yeah. Four years, and we’ve been working with insurance for the past five years, but with policy review specifically for the past four years. Oversee all of the insurance verification teams at Jones, and Hisrain is in charge of one of them, policy review, one of the most, important ones in the sense of the level of review that we’re doing and the risk insurance programs that are, customers are running, and how we can collaborate with them and help with them as well, in reviewing the coverage gaps and making sure that nothing is left behind. And with, you know, on that note, Hisrain, welcome to this webinar. I’m so happy to host this for you today, so you can explore explain to everybody what you’ve been talking about for the past years. Please talk to us a little bit why policy review is so important.

Hisrain: Thank you, Jessie. Yeah, i’m pretty excited too. Yeah, so policy review, just to take a step back a little bit, I want to talk about the COI we’re all familiar with the COI and it tells us a very important story, but in very broad strokes. The COI is going to tell us if the policy exists, the limits, the dates, and about specific coverages that we can find it there. So, for example, if the builder or the GC and their entities are covered as additional insureds on an ongoing completed basis. Also, if the policy of the trade or the sub is going to pay first, or if they are going to ask for contribution or not, ideally not, with a primary and non-contributory clause and also to make sure that the policy is not the insurer is not going to go after reimbursement or have their rights of recovery applied, with a waiver of subrogation. So that’s going to show in the COI But the policy shows us the details, the nature of these coverages, and also if there’s anything in the policy that excludes coverage completely. So that’s why builders and GCs should read the policy, or at least the schedule of forms to make sure that even if the COI is perfect, that there’s no exclusions in the policy or anything in the policy that shows there. So, what we do when we are actually doing the policy review is to go through each of the forms, understand the nature of the exclusions, if they exist, and also we can compare with the scope of work, so ideally, we’re not flagging all the exclusions, even if they are not specific to that scope of work, for example. So we compare it with the scope of work and also we will flag the gap to give visibility to the builder, to the GC, and give the opportunity to the trade to the side to fix the policy if it’s possible.

Jessie: Yeah, that makes sense. Something that you said that called my attention here, and I think we can start with that, because as you said, you know, let’s take a step back. We’re talking about policies here, but what everybody understands you know, the COIs like the certificates of insurance, they are common to everyone whenever you’re running something like this, you have to at least collect a COI but you said that it tells the story in broad strokes. What does the COI leave unanswered? I think that’s the question that we can start what if i’m a GC, if i’m a home builder, what should I be concerned about that the COI is just not telling me? Let’s start with that.

Hisrain: Yeah, honestly, that’s quite a lot that the COI leaves unanswered. The COI it does say on top, like in its face that it’s for information only. It’s not change the coverage is going only to tell you what exists, and they’re not going to tell you what doesn’t exist, like what is not covered by the policy, basically.

Jessie: And that’s a great point. That’s interesting, and I always explain this to customers as well when we were talking to them the COI itself is saying this is for information only. So, if you’re making a big deal about the COI showing things that maybe the agent will include in the COI, but then is not in the policy, you’re still not covered, right? So please continue.

Hisrain: Yeah, no, that’s definitely it. It’s going to tell you what is in the policy in terms of, like, what is covered, but most importantly, it’s not going to tell you anything about exclusions, what is not covered by the policy. There’s so many things that can stop or prevent coverage. There can be exclusions proper, but also they can be limiting clauses that can shrink coverage significantly without depleting it completely and one thing that I can think of right now is a contractual liability limitation your… that the sub is signing an indemnity agreement. But if the policy does not state that, they will cover that the indemnity basically it won’t. So even if the agreement is signed, it’s not gonna matter anything to the insurer in terms of actually covering and paying for that claim. Something else that can exist in the policies an action over exclusion when a subs employee gets hurt and they sue the builder or the GC, or the owner, and that can happen quite a lot. There’s also things like classification limitations, where only, like, the sub is going to tell the insurer what working their classification. So they’re classified to do framing. So that’s their classification there but they’re doing roofing work for the builder, they’re not going to be covered if they have that limitation in the policy. And something else that I can think of is, you can see the limit on the COI that says 1 million, but if the policy says that the defense costs are inside the limit. If there’s a claim, that 1 million can shrink very fast just because the defense costs are built into it. So none of that shows on the COI and we can only verify it by looking at the actual policy

Jessie: Yeah, something that keeps coming up when we’re talking about what the COI doesn’t show is exclusions, of course, right? And as you said, the only proper way of knowing that, you know, something’s not covered is by looking at the policy, looking for them. I think that a good starting point to talk about exclusions is, what are the most relevant ones? Especially, I would say, you know, for residential construction, maybe for GCs, you know, what’s concerning to them, that they should be, looking out for, and also yeah, let’s start with that. Let’s start with the most relevant ones, and if they are, you if they are doing a specific scope of work, how does that change the way you review the exclusion as well? Yeah

Hisrain: And i’d say the easy answer would be like the exclusion that matters is the one that’s preventing coverage for the specific work that’s being done. For a home builder, for example, that means residential work there’s so many different residential exclusions in the market. There’s broad ones, residential work, all residential work is excluded from a policy, and that happens a lot when a sub is doing primarily commercial work and I mean, they are hired to do residential work, they might not be aware that they have a policy that does not go for any residential work. So that’s an easier to spot exclusion, but there are very narrow exclusions that is going to apply to the specific type of residential work, for example, for condos or townhomes, or it can be for the size of the development. If they, like, 25 is the cap. They’re only gonna cover up to 25 units. More than that, it’s going to be excluded it can also be for remodeling or conversion work, but if it’s new construction, which is what typically the home builders are doing, it’s not coverage. So there’s a lot of different ones, and, because the projects vary. You might do remodeling in a project, you might do a condo’s in one, apartments in other. Making sure to follow these exclusions is very important because you shouldn’t say like just residential is the word to be afraid of, but actually like what is the residential exclusion that’s applying to that project and it’s not going to lead to a lot of friction with the sub so it needs to be applicable to that. So that’s where the scope of work and the project comes in. There’s also other things, like, we can talk about the project in, in general, but for example, if there’s grading work or foundation work subsidence exclusion is very important. And if like interior painting height, anything, everything that’s related to specific types of work it’s important to look at the scope of work to make sure that we are flagging the applicable gaps and not causing friction when it’s not applicable, basically.

Jessie: Yeah, no, that makes sense. And something that you said that also called my attention is that sometimes subcontractors do not know that they have a certain exclusion that will impact the projects, not like they are intentionally making their policies bad, so they, you know, in case an accident happens, the coverage doesn’t apply. It’s that, first, the level of insurance knowledge is not, you know, they are not sophisticated about insurance in the first place, but also, as you said, there are different specific, you know, language that will change how the exclusion behaves as well. That’s a good point, and I think that an example can really help bring this to life, so could you please walk us through one of the examples you have there? What work is the subcontractor doing? What does the builder require and why does the COI look acceptable when you’re first reviewing it?

Hisrain: Sure, yeah, let me share my screen for the ones just listening and not only listening in. I will make sure to describe what we’re seeing but I believe everybody can see my screen now here we have the requirements. So this is a starting point. I want to go through these requirements. They’re pretty standard. We have 1 million for each occurrence. We have 2 million for the general aggregate we have those coverage that I mentioned, the primary and non-contributory, the waiver of subrogation, coverage for this ongoing and completed operations, a contractual liability to make sure that the indemnity agreement is valid the per-project aggregate to make sure that 1 million is applicable to that project specifically and not being shared between projects. Occurrence basis, meaning that the claim happens after, like, for something that happens during the policy period, but the claim is just going to apply. And also, in addition to that, they have a requirement asking for the full policy with some criteria, saying that the policy cannot have residential exclusions for all sorts of different types of residential work, multi-unit housing, townhouse, condominium, etc. And designated work operations specific to their scope of work. And in this example here that i’m sharing, the work is for a new residential, project, construction project with 300 units. Yeah. So with that in mind, we can look at the documents they provided. First is the COI. So we have a COI here, a simple one, and we can see here some things, which is that they have the correct limits, 1 million for 2 million, they the occurrence box checked, they have the project box checked, and it might not be she was visible, but I Just bringing notice to the box here it says that the builder and its subsidiaries are additional insured, which is okay by the contract for ongoing and completed operations, and it also says that the coverage is primary and also has a waiver of subrogation based on that, without regarding, like, the exclusion requirements and the policy requirements, if the review stopped here, then we would have a approved sub.

Jessie: Yeah. No, by the way, I just want to say to our audience that this certificate is, of course, a sample because we need to protect our customers for privacy issues, right? We are keeping this as neutral as possible in terms of the documentation, but this is actually an example of a real case we had in Jones in reviewing a certificate of insurance and then reviewing the full policy. And it’s not one single example. This happens all the time, right? Hisrain, where have a perfect COI, and as you said, if we stop here, they would be compliant in Jones. Awesome. Now, on paper, the certificate checks out, now we are going to be looking for the policy, so I imagine that’s where the answer changes. Can you point out to the exact warding in the policy where you guys identified, you know, oops, they’re actually not compliant.

Hisrain: Yeah, sure. So when we are reviewing the policy, the first thing that we’re going to do is to check at the forms and the endorsement schedule or schedule of forms it’s gonna list everything and looking here, we can see a full form here, and we have a lot of exclusions listed. We have a war liability exclusion, a professional services exclusion, but for our purposes here, we can see that we have two residential exclusions. So we know that by the requirements of this builder that they cannot have residential exclusion. So we have one here that’s for residential conversion and another for new residential construction. Just by looking at this here, we know that there’s problematic wording, but we actually need to review the forms to understand why or if they are applicable to that project or not. So, let’s start with the new residential construction exclusion. So, we have this form here, and I want to highlight some of the parts. First, we… we know that’s for new residential construction, so they’re not talking about remodeling or conversion or repair work they’re talking about the from-the-ground-up new residential construction but as of with many exclusions, we have exceptions. And the exceptions indicated here by a lot of different sections, with boxes that can be checked or not. So, in this case, the options are custom homes, condominiums townhouse, site work, but the only box that we have checked is the specific projects with the description saying that they are not excluding, it’s an exception saying that tract work limited to 225 units per development. So we have we know that this project is a new residential construction, so this might apply. And we know that they have per development 300 units. So even though they have this specific exception, this exclusion applies to them. So in this case, unless they can somehow amend the policy they are not going to have coverage for this project they’re working on we can also take a look at the definition of what is considered a new residential construction, and we know here another exception that’s not easy to see. They have a very big, definition but he says here that the definition does not apply to apartments, military barracks and hotels, motels, etc. So in the definitions, we also have an exception, which again does not apply here, so they don’t have coverage there.

Jessie: Yeah, that brings up the big question, who’s actually protected and for how long? What do these endorsements tell us about additional insurance, you why the work is happening, and after it’s done, what are the conditions that still need to be checked here in the policy?

Hisrain: Yeah. We can take a look at the other exclusion just to see what is being excluded there, and see if there’s any other language, because the two can apply at the same time. So, if we look at the conversion exclusion this one we can already know that it does not apply because we’re talking about new construction. Yeah. So if we take a look at building or structure which is changed to converted residential project property, sorry, and it doesn’t matter if the conversion is performed by you or on your behalf. They don’t have coverage. This is important exclusion that might apply to a lot of projects, but for this example specifically since they were only doing new residential exclusion, we would not flag these as a gap. They would not need to amend the policy only for the first exclusion that we talked about.

Jessie: Okay, so I jumped the gun here going to the additional insured part. I thought they were cleared with residential exclusion. So what you’re saying is yeah, one of the exclusions was not a problem because it didn’t apply to the work that they were doing, but there was another that was a problem. So, in that sense, they would be not compliant, right? Yeah. So, okay, two important exclusions, one you guys reviewed, you know, it’s not a problem, but the other one still is so flagged as a gap. That’s important to say because I think one of the biggest concerns that I see from customers when we’re talking about exclusions review is that they’re going to have to waive things left and right because exclusions are part of the policy. They necessarily in the work of reviewing your policy, you’re going to encounter in exclusion, the difference is, is it worth of being flagged or not, right? So what you were describing is precisely that part of it is a problem, the other part isn’t. So let me flag what is actually concerning to the customer here. Great. But then, my question remains, right? Now, I think that the other question is, you know, who’s protected for how long if the work is completed, I think those are also interesting aspects of the policy that you guys have to review. Can you walk us through that as well?

Hisrain: Yeah, sure. And we have here, like, just going back to the COI We know that they state in the COI and they actually have it in their policy that they have those endorsements. Let me go here. They have on the forms and schedules endorsements, additional insured for ongoing operations, CG 20 10, and additional insured for completed operations, CG 20 37 And based on the COI and based on the endorsements that we reviewed, they do have the specific builder listed. So they would be protected for ongoing work and for completed work, which is usually for 5 or 10 years, but because of those exclusions, even though everything is correctly for… everything is correct for the additional insured portion, even though they are on paper, protected by the policy, because not even… because that exclusion applies to the whole policy. And not even the insured is protected by that exclusion. It also goes to the additional insured. And in that case, no one is protected. The insurance policy does not apply.

Jessie: No, that makes perfect sense. And that’s a good point to make when going back to what I said before, that the subs do not intentionally know that they don’t have that coverage and are okay with it, right? They don’t even know that they are exposed as well, their business is exposed as well, right? And in that sense, because the nature of the job is excluded it doesn’t matter if everything else is right literally, you have no coverage. So that’s why, you know, the COI looking compliant doesn’t necessarily give you the protection and the assurance that you need, right? Like, I feel like when people see compliant, they feel okay with working with a vendor. They, you know, they feel peace of mind. In fact, you shouldn’t if you’re stopping at the COI and you have, you know, high-risk projects that would require A deeper level of review, like policy… reviewing the actual policy as you’re describing. Well, let’s see what else? In this example, the review actually showed a gap, as you described. What’s next? You know, what do we do with that, you know. Would the team go to the broker specifically to clarify, to discuss, to amend the policy, how does this process look like after you guys recognize there’s something incorrect with the policy?

Hisrain: Yeah, sure. So the first something that might happen is that they say that the exclusion is not applicable to the scope of work. In this case, it was clear in the policy and the information that we had that it did apply to the scope of work and the project that we’re working on but if we don’t have that information or if they’re still claiming that, we can loop in the builder, we can loop in the GC so they can make that decision, whether it’s applicable or not but if it is, then they can do different things. One is to issue a carve-back or an exception, removing the exclusion for the specific builder or the specific GC or the specific project that they’re working on. Interesting. And they can also issue, sorry, actually get a new policy for the exact work that’s being excluded. So it happens sometimes that they will have one policy that is covering most of their work, but not that specific situation in this case, the residential work for 300 units of tract work and they have another policy covering exactly that. And then when we review those, when we get those two policies, we will review both at the same time to give an accurate compliance status to the builder and making sure that both are taken into account for that.

Jessie: Got it. Well, there is one thing that i’m thinking of here right now, which can be a problem because, we know the insurance world, you know, it’s changing a lot. There are a lot of threats, and the carriers behave differently, you know, in taking on that risk or not, and that’s why many times we see some of these things excluded, right? Because the carrier is just simply not willing to take on that risk. And in that sense, you know, they can go back to their carrier for that specific policy and say, I need to amend my policy, I need to include this coverage that is excluded as you said, a carve out or maybe they need to purchase this with another carrier what happens if they simply cannot fix that gap? You know, what’s the proper way to document this decision? You know, is it a matter of the home builder or the general contractor deciding whether or not they want to take on that exception? What’s you know, what’s the process there in your experience?

Hisrain: Yeah, so when they are not willing or they cannot amend their policy, that is when we need input from the builder, from the GC To make sure, okay, this is the risk that, is being there is that, yeah, it’s assumed by this policy. Do you want to accept that risk, or do you feel comfortable with that risk? That is a business decision that it’s important to when it’s decided that the risk is going to be accepted, that you document it with a sub’s explanation why they are not willing or they cannot amend the policy. Who approved that and also set up a re-review date. So that exception is not forever, of course. So it’s important to have everything, and that’s why in our system at Jones, there’s an easy way to upload documents saying that this is waived on that date and needs to be reviewed again on that date, and who approved that, and based on what document. And it’s important to have everything, so when… if a claim happens, you like, you can follow the paper trail and get that information in the system.

Jessie: Yeah, that’s perfect. And we’re having a very important, interesting conversation about policy review, but not to forget about what Jones can also do, and I would love for you to walk us through, you know, this process, because you just talked about exceptions, right? Making that exception, documenting that exception, who approved it, you know, retracting that exception as well at a certain time, like, we can do all those things can be done at Jones. But I would also love to hear about your experience, you know, in reviewing these policies, like, with the collection, with the review process, with the, you know, renewal process as well, and how technology has been assisting with the process of policy review. And I think you can talk about that really well we’ve productized policy review in the past, you know, couple of years, but there was a moment in time where we were doing all of these processes really, you know, manually in the beginning, while we were still learning our way through the process of doing policy review. So, I would love to hear your thoughts on how technology has assisted

Hisrain: Yeah no, yeah, sure. I think I can start talking about collection. I think collection is a pain point for everyone that ever tried to collect policies. I think with the developments at Jones, we have a lot of help from technology to help make the process easier for the subs and easier for us to get those policies. And, like, applying grace periods when it’s necessary, if the policy is not ready yet and then getting that policy to our analysts so they can easily review it and separate documents and etc. We also have AI that is going to help us it help us read the… the… that list of exclusions in the forms, and we have a database that the AI and the OCR uses with exclusions and like, like you mentioned, we’ve been building that, so at the beginning, we still needed to go through each and every document, even the ISO ones, but with our database, things can be done much quicker. Like you mentioned. Everything like the technology and the system and the database helps us a lot with that, but it only takes us so far, of course, because the analysts, they’re going to make those decisions, right? The decision to read the actual language of the review sorry, of the exclusion and saying that, okay, this is only excluding work up to so for residential conversion, and I know that this project is for new construction. So they’re going to make those decisions about, oh, this applies based on the scope of work. This does not apply. So we won’t need to add a gap and that is a challenge because carriers are submitting new exclusions every time, every day, and there’s new wording, and there’s trickier wording every day, so, it’s important that we use the technology to help us get to the decision faster, but the decisions are still done by our analysts using our expertise that we’ve built over 5 years to use that assistance from the technology to apply the customer preferences and our insurance knowledge here.

Jessie: Yeah, perfect. I love that concept of combining technology and expertise I do think it’s the perfect combo. You cannot really rely on, you know, solely in one of them. And I agree that’s what we’ve been also seeing and hearing about, the fact that the carriers are constantly trying to include new language, you know, in different ways to limit coverage and keeping that, you know. Rationale is important, adjusting to it as well. I think that’s something that we can say that is a benefit for Jones, is that we get access to so many different policies and carriers, we have a good sense of what to expect from a certain carrier, so that gives us the muscle, right, to be prepared for this new creative ways that they come up with to change the policy. All right, so let’s wrap up. We are almost at a time here, and I do want to get to questions. If you guys have questions, please submit them, and we’ll be trying to get to some of them before we wrap up, but now that we’re close to wrapping up Hisrain, let’s make this practical. If a team is checking COIs today, they do not have any infrastructure, any system that does policy review. How can they give the first step? What’s the first thing that they can do in order to go a bit further than the COIs

Hisrain: Yeah, I think an amazing first step would be to collect schedule of forms. It’s easier to get than the full policy, it’s going to show you a list of all the forms and the titles. Of course, it’s not going to give you the full picture. It’s not going to say everything that’s in the policy with details, but already understanding if there’s a residential exclusion, or if there’s a designated work exclusion, or any exclusions that apply to this the scope of work, having that list is a great first step, and then you can request the specific forms for a deeper review and build that policy review over time if you don’t want to collect the full policies right away, of course, yeah.

Jessie: Yeah, that’s a perfect tip. I agree with that. We are also recommending the same for customers. They are not ready to… you know, because sometimes, there’s also an issue of the contract, right? Like, if my contract does not include language that the subcontractor needs to provide policies, they might be resistant to sharing the policies with us. So there is sometimes a process where you need to go from only COI review to the full policy review that takes time and a good way to start is, you know, collecting the schedule of forms. That’s a great point, and reviewing the specific forms accordingly to the… I mean, it is a great step, but it also requires expertise, because there are a lot of endorsements that I know are going to be excluding coverage that you… if you just look at the title, you have no idea right? I know that we have some cases like this.

Hisrain: Yeah, we have some we call them extension endorsements. There’s extension endorsements that are going to have a lot of sub, sub, sub, sub sections, there’s going to be an exclusion there. So yeah, the schedule of forms is a great first step. It’s not like the final step, basically.

Jessie: Yeah, yeah, it’s a point here that it’s a good way to start, but you definitely need to have the know-how in order to take proper care, right, in the review. Well, we have one question for now, and I will be seeing if we get more but the first question is, do you think the need to review policies and not just COIs is becoming more important. If so, why? Like right now, is it the moment where we are looking at this and thinking it is becoming more important. If so

Hisrain: I think I would say yes, because, like I said. Insurance companies are constantly coming up with new types of exclusions and yeah, I think I think that’s basically it, it’s something that happens A lot that we are seeing and it also is about what carriers are you using and what plans of insurance you’re getting, so without that information that a builder might not have in only a broker might have, not even the sub might have. Because of that there’s a lot of exclusions that might be baked into policy because of a plan they’re getting or the carrier they’re using and having that, it’s important to review the policy because the COI might not tell you the full story and the subs themselves are not going to know, basically.

Jessie: Yeah, yeah, perfect point. And I think that what we’ve been seeing with the general contractors, home builders at Jones, is that the dealing with the claim is not a matter of you know, if it happens it’s going to happen, right? It’s a constant for them now. So policy review helps them control that better because it’s not going to catch them by surprise, right? A lot of times if you do not know that a subcontractor has an exclusion, that ultimately means you’re going to have to pay out you are going to have to deal with that, right? So, knowing that a sub does not have specific coverage or excludes the coverage in a way that if an accident of that nature happens, it’s going to be, you know, completely on your court. It helps you at least take the decision whether or not it makes sense to work with them in the first place. So definitely pressing to review policies. There’s another question here, which I think is extremely interesting, and I really like it. If an insurance policy is renewed, do we need to review the full policies again? If the carrier is the same what is Jones procedures in this scenario?

Hisrain: It’s important to take a look even at the renewals but there’s a lot of different approaches to that. We have an approach if the builder or if the GC is very conservative, it might be important to re-review the full policy again, make sure that in the renew, nothing was added or nothing was changed any limitations are still the same from the previous policy. Other approaches include just making sure that the schedule of forms stays the same, the language stays the same, it’s important to get the full policy, i’d say, or at least the schedule of forms on that annual basis, just to make sure that nothing changed. But it might make sense for some customers or for some builders, some GCs to be a little more lenient, not fool, lenient of, like, oh, let’s forgo the policy just because it’s a renewal, but be a little more lenient with the review without, getting all the forms because it’s usually the same. It’s another assumed risk, of course, but it’s one that… it’s a common approach in the industry.

Jessie: Yeah, I know that when we’re tracking COIs, it’s a common leap that we take if the COI stays exactly the same in terms of the policy number, the carrier, it’s okay to assume that they have the same endorsements, but of course, if you’re concerned about exclusions, it’s a whole other game I would agree that at least, you know, making sure that the schedule of forms stays the same, at least gives you that, you know, probability, it’s less probable that the language in the endorsement itself have changed. All right, I think that’s it for today. We’re at time as well. Thank you so much for keeping up with the policy review webinars. We know we have some people here in the audience that have been attending to other webinars as well. Thank you for those that, you know, joined for the first time. I hope we can see you again in the next one. Have a great rest of your day.

Ready to automate your COI compliance?
Talk it through with an insurance expert
Get Compliance Video Course for Free
Learn how to review COIs and other insurance documents
●
10 min read

CMiC CONNECT 2026 Recap: AI Arrived in the ERP. Compliance Has to Keep Up.

What CMiC announced at CONNECT 2026, why AI inside the ERP raises the bar for subcontractor insurance compliance, and what...
●
13 min read

ICSC New York 2026: Bring Portfolio Insurance Compliance Into the Conversation

Heading to ICSC New York 2026? Five practical questions for evaluating AI and insurance compliance technology across your property portfolio,...